| 1 | Process and Diameter Range | Minimum and maximum inlet and finished-wire diameters; supported steel grades; applicable tensile-strength range; number of drawing passes. | Check the proposed process schedule against the buyer’s actual material certificates, incoming wire size, and finished-wire specification. | Compare only machines demonstrated for the same material, diameter range, and product requirements. There is no single universal diameter range for all drawing lines. |
| 2 | Finished-Wire Quality | Specified diameter tolerance, ovality or roundness limits, surface-quality requirements, and the inspection method used. | Request measured samples or a witnessed acceptance test using calibrated instruments and agreed sampling conditions. | Compare results against the product drawing and applicable product standards; confirm that measurements are taken under comparable conditions. |
| 3 | Production Speed and Throughput | Line speed in metres per minute and expected output by finished diameter, steel grade, and pass schedule; identify continuous and peak ratings. | Ask for a production trial or a documented calculation tied to the specified material and product. Distinguish loaded production speed from no-load speed. | Compare output at the required product specification, not headline maximum speed alone. Include changeover and normal operating interruptions in capacity estimates. |
| 4 | Drawing Dies and Reduction Schedule | Proposed pass sequence, die sizes, reduction per pass, die-box arrangement, and compatible die dimensions. | Have the supplier provide the pass schedule for the buyer’s wire grade and target properties, then review it with the process or quality team. | Evaluate whether the schedule is application-specific and repeatable. Die selection and reduction must suit the material and the desired finished-wire properties. |
| 5 | Drive System and Energy Use | Motor rated power in kW, drive configuration, operating load assumptions, and measured energy consumption per tonne if available. | Request test conditions and measurement records. Compare energy figures only when material, finished diameter, line speed, and operating conditions are aligned. | Rated motor power is not the same as actual energy consumption. Ask for both equipment ratings and application-based operating data. |
| 6 | Lubrication and Cooling | Lubrication method, lubricant requirements, filtration details, cooling capacity, operating limits, and routine maintenance needs. | Review the equipment specification and maintenance plan; confirm compatibility with the buyer’s process, utilities, and lubricant-handling requirements. | Compare operating requirements and maintenance burden, including filtration and cooling provisions. Do not assume one lubrication setup suits every wire-drawing application. |
| 7 | Annealing and Process Integration | Whether in-line or separate annealing is supported; applicable wire range; rated power; temperature and speed limits; atmosphere requirements where relevant. | Request an integrated line layout and process specification. Confirm that the annealing stage matches the required material condition and production route. | Compare only configurations that meet the product’s required mechanical properties and process sequence. Annealing requirements depend on the steel grade and final application. |
| 8 | Controls and Production Data | Control functions, recipe management, alarms, operating-data records, export options, and available integration interfaces. | Review a control-system demonstration and a sample production report; verify which functions are included in the quoted scope. | Check that operators can record key process settings and trace production batches in a format compatible with the buyer’s quality procedures. |
| 9 | Safety and Compliance Documentation | Risk assessment, guarding and emergency-stop details, electrical documentation, operating instructions, and applicable conformity documents. | Review the machine-specific documentation and confirm requirements for the installation country. Relevant references may include ISO 12100 for machinery risk assessment and IEC 60204-1 for electrical equipment of machines. | Verify compliance against local regulations and the machine’s actual configuration. A general standards reference is not a substitute for required conformity documentation. |
| 10 | Installation, Service, and Lifecycle Support | Installation and commissioning scope, operator training, warranty terms, recommended spare parts, maintenance schedule, and service-response commitments. | Request a written support plan with defined responsibilities, coverage, response times, and spare-parts availability terms. | Compare total ownership requirements—not just purchase price—including commissioning, routine maintenance, consumables, spare parts, and production downtime support. |