| Regulatory Compliance | Applicable emission limit | Guaranteed outlet SO₂ concentration must comply with the project’s environmental impact assessment, operating permit, and applicable national, provincial, or municipal emission limits. There is no single universal limit for every Chinese power or industrial project. | Approved permit conditions, design-basis document, pollutant balance, and a written performance guarantee linked to operating conditions. | 12% | Critical |
| Regulatory Compliance | Standards and monitoring interface | Design should identify applicable Chinese standards for thermal power or industrial emission control, flue-gas sampling, continuous emission monitoring, electrical safety, pressure equipment, and environmental protection. | Standards register, compliance matrix, CEMS interface specification, calibration procedure, and inspection records. | 7% | High |
| Removal Performance | SO₂ removal efficiency | Wet limestone–gypsum systems commonly target approximately 95%–99% SO₂ removal, subject to inlet concentration, gas flow, liquid-to-gas ratio, limestone quality, oxidation conditions, and absorber design. | Process calculation, pilot or reference test data, guaranteed operating envelope, and acceptance-test method. | 12% | Critical |
| Process Selection | Technology suitability | Wet limestone–gypsum FGD is widely used for large continuous flue-gas streams; dry or semi-dry systems may be more suitable where water use, space, waste handling, or lower sulfur load is decisive. | Alternative-comparison report covering water balance, by-products, land requirement, maintenance, and lifecycle cost. | 7% | High |
| Reliability | System availability | A well-designed multi-train system may target annual availability of approximately 98% or higher, excluding planned outages and events outside the supplier’s control. | Availability calculation, redundancy philosophy, historical operating records, trip analysis, and planned-maintenance schedule. | 10% | Critical |
| Reliability | Redundancy and bypass philosophy | Critical pumps, fans, agitators, instruments, and control systems should be assessed for duty/standby capacity, isolation capability, safe bypass arrangement, and maintainability during operation. | Process flow diagrams, cause-and-effect matrix, equipment list, spare-capacity calculation, and failure-mode analysis. | 8% | High |
| Energy Efficiency | Auxiliary power demand | For large wet FGD systems, total auxiliary power demand is commonly evaluated in the approximate range of 0.8%–2.5% of host-plant gross generation, depending on gas flow, pressure drop, slurry circulation, oxidation air, and dewatering requirements. | Guaranteed power-consumption curve, motor schedule, fan pressure-drop calculation, and measured commissioning data. | 8% | High |
| Water and Materials | Water consumption and limestone quality | Water balance should include evaporation, purge, mist eliminator washing, gypsum moisture, and wastewater treatment. Limestone quality is often assessed using available CaCO₃ content, reactivity, particle size, and impurity levels. | Water-balance sheet, limestone laboratory analysis, slurry chemistry calculation, and wastewater discharge plan. | 7% | High |
| By-Product Quality | Gypsum utilization potential | Where gypsum is intended for sale or construction use, quality should be evaluated by purity, moisture, chloride content, particle characteristics, and consistency. Actual acceptance limits depend on the end user and local specifications. | Laboratory test results, dewatering design, product-quality guarantee, storage plan, and end-user acceptance criteria. | 5% | Medium |
| Capital Cost | Installed project cost | Budgetary cost must be normalized by flue-gas flow, sulfur load, gas temperature, absorber configuration, civil works, electrical scope, wastewater treatment, and taxes. A low equipment price may exclude major balance-of-plant items. | Itemized commercial offer, battery-limit definition, exclusions list, civil and electrical scope, taxes, logistics, and commissioning costs. | 8% | High |
| Lifecycle Cost | Operating and maintenance cost | Lifecycle analysis should include limestone, electricity, water, wastewater treatment, reagent handling, replacement parts, labor, inspection, waste disposal, and planned overhaul costs over at least a 10-year period. | 10-year total-cost-of-ownership model with declared assumptions, sensitivity analysis, and consumables price basis. | 8% | High |
| Delivery Capability | Schedule and project controls | Typical evaluation milestones include basic design, detailed engineering, equipment manufacture, factory inspection, shipment, installation support, commissioning, and performance testing. The schedule should include procurement lead times for fans, pumps, absorbers, and control equipment. | Integrated project schedule, quality plan, manufacturing progress reports, inspection and test plan, and delay-management provisions. | 5% | Medium |
| Quality Assurance | Manufacturing and inspection controls | Supplier quality systems should cover welding procedures, non-destructive examination, corrosion-resistant materials, coating systems, dimensional inspection, electrical testing, and traceability of pressure-bearing or rotating components. | Quality manual, ISO certificates where applicable, welding qualifications, inspection records, material certificates, and factory acceptance test reports. | 6% | High |
| Service Capability | Warranty, response, and spare parts | Commercial terms should define warranty duration, defect-response time, remote support, on-site service, recommended critical spares, software support, and availability of replacement parts throughout the expected service life. | Warranty certificate, service-level agreement, spare-parts list, response-time commitment, service organization chart, and support references. | 5% | High |
| Safety and Environment | Risk control and maintainability | Design should address slurry leakage, corrosion, confined spaces, rotating equipment, chemical exposure, electrical isolation, wastewater handling, access platforms, drainage, and safe maintenance procedures. | HAZOP or risk-assessment report, safety design review, corrosion-control plan, access drawings, emergency procedures, and training materials. | 5% | Critical |