| 1 | Building-code compliance | Confirm that the proposed home can be designed for the applicable local building, planning, fire, and energy requirements. | Project-specific code assessment, engineering documents, and details of the design professional responsible for local compliance. | Building requirements vary by country and jurisdiction. A standard model may need engineering changes before approval. |
| 2 | Structural design and loads | Check that the design considers site-specific wind, snow, seismic, and other relevant structural loads. | Structural calculations and drawings identifying the design criteria, materials, connections, and foundation assumptions. | Metal framing and cladding must be designed for the conditions at the actual building site, not just a general climate zone. |
| 3 | Scope of supply | Clarify whether the offer covers a shell, a weather-tight structure, or a completed home, and identify all exclusions. | Itemized scope, inclusions and exclusions, responsibility matrix, and a list of work requiring local contractors. | The term “prefabricated home” can describe different levels of completion, so comparing headline prices alone can be misleading. |
| 4 | Materials and corrosion protection | Review the specified steel grade, coating or corrosion-protection system, fasteners, and suitability for the site environment. | Material specifications, coating data, maintenance guidance, and details for coastal or otherwise corrosive locations where relevant. | Material selection and exposure conditions affect durability and the maintenance a building may require. |
| 5 | Thermal performance and condensation control | Ask how insulation, thermal bridges, air sealing, ventilation, and moisture management are addressed in the proposed assembly. | Wall and roof assembly details, thermal-performance calculations where applicable, and condensation-control specifications. | Metal components conduct heat, so the complete wall and roof design should be assessed rather than insulation thickness alone. |
| 6 | Manufacturing quality control | Understand how components are measured, fabricated, labeled, inspected, and protected before dispatch. | Quality-control procedures, inspection records, component tolerances, and packaging or storage instructions. | Consistent fabrication and clear identification can reduce assembly errors and installation delays. |
| 7 | Shipping and site logistics | Verify shipping terms, packing method, delivery sequence, unloading needs, and access requirements for the site. | A written logistics plan covering transport responsibilities, shipment dimensions, delivery estimates, and damage-reporting procedures. | International transport, customs processes, site access, and unloading equipment can affect both cost and schedule. |
| 8 | Installation support | Determine whether installation is included, locally available, or managed by the buyer, and what technical support is provided. | Installation manual, crew requirements, training or supervision options, and clarification of who coordinates subcontracted work. | Prefabricated components still require correct foundations, connections, sequencing, and weatherproofing on site. |
| 9 | Warranty and after-sales service | Read the warranty terms for covered components, duration, exclusions, claim procedures, and service availability in the project location. | Written warranty documents, maintenance requirements, spare-parts information, and a defined process for reporting defects. | Coverage and remedies depend on the contract. Clear written terms help set expectations after delivery and installation. |
| 10 | Total project cost and schedule | Compare the full delivered and installed cost, payment milestones, production lead time, and dependencies that may affect completion. | Itemized quotation, project schedule, payment terms, change-order process, and stated assumptions about permits, foundations, and utilities. | The purchase price may not include site preparation, foundations, local approvals, utility connections, taxes, or installation. |