| 1 | LNG and Cryogenic Experience | Relevant experience designing or supplying pump skids and associated equipment for LNG or other cryogenic duties. | Anonymized project references, scope of supply, operating conditions, and customer acceptance records. | Give greater weight to completed, comparable LNG transfer projects than to general-purpose pump experience. |
| 2 | Process and Hydraulic Design | Whether the proposed pump arrangement, capacity, differential pressure, and operating range match the project’s transfer requirements. | Datasheets, performance curves, hydraulic calculations, and design-basis documents. | Compare the quoted duty point and operating envelope against the project specification; do not infer performance from motor rating alone. |
| 3 | Cryogenic Materials and Sealing | Suitability of pressure-retaining parts, seals, valves, and instruments for the specified LNG temperature and service conditions. | Material specifications, traceability records, design calculations, and applicable cryogenic test reports. | Check material compatibility and documented design temperatures against the project requirements; LNG is commonly stored near its atmospheric boiling point of about −162°C. |
| 4 | Floating-Unit Integration | Fit with the vessel or floating facility, including footprint, weight, lifting points, piping interfaces, vibration, and access for maintenance. | General arrangement drawings, interface register, load data, and installation or maintenance plans. | Assess against the actual vessel layout and interface requirements rather than relying on a standard skid configuration. |
| 5 | Safety and Hazardous-Area Design | Hazardous-area equipment selection, gas detection and shutdown interfaces, electrical protection, and documented risk controls. | Area-classification basis, equipment certificates, cause-and-effect documentation, and safety-system interface details. | Verify certification and protection concepts against the project jurisdiction and hazardous-area classification; IEC 60079 is a relevant standards series for explosive atmospheres. |
| 6 | Standards and Class-Approval Readiness | Ability to identify and meet applicable LNG bunkering, vessel, port, and classification-society requirements. | Compliance matrix, design-review records, certificates, and approval status for the specific project. | Check project applicability of standards such as ISO 20519 for LNG bunkering and confirm requirements with the relevant authority or class society. |
| 7 | Manufacturing and Quality Control | Documented control of design changes, welding, inspection, instrument calibration, non-conformances, and component traceability. | Quality-management certificates, inspection and test plans, sample manufacturing records, and audit access. | Evaluate actual project quality records as well as certificates; confirm inspection hold points and record retention before award. |
| 8 | Factory Testing and Documentation | Completeness of the proposed factory acceptance test program and ability to demonstrate specified performance and control functions. | FAT procedure, calibrated-instrument list, test reports, and punch-list closeout process. | Require tests and acceptance limits to be agreed in the contract; confirm which tests can be performed at the factory and which require site or cryogenic testing. |
| 9 | Controls and Operational Reliability | Control-system compatibility, alarms, interlocks, operating procedures, and the supplier’s approach to maintainability and fault response. | Control narrative, I/O list, interface protocols, alarm and trip list, and recommended maintenance schedule. | Review interfaces with the vessel or facility control system and verify that operating and shutdown sequences are clearly defined. |
| 10 | Delivery, Service, and Lifecycle Support | Realistic project schedule, spare-parts availability, commissioning assistance, warranty terms, and access to technical support. | Project schedule, proposed spare-parts list, service plan, warranty conditions, and support response commitments. | Assess the complete lifecycle proposal and identify schedule assumptions, exclusions, and responsibilities in writing. |