| 1. Define the part and process | Part geometry, forging method, and process stages | Part drawings, CAD files, material grade, billet dimensions, and whether the process is open-die, closed-die, or another forming operation | Press selection depends on the workpiece, tooling, and forming process—not tonnage alone. |
| 2. Establish material and temperature conditions | Workpiece material and forming temperature range | Alloy or steel grade, hot or cold forming, billet temperature at pressing, and expected temperature variation | Material strength and temperature affect deformation resistance, tooling, and the required press force. |
| 3. Size the force for the actual operation | Required forming force, with an engineering margin | Projected contact area, material and temperature data, die design, process sequence, and force estimates from a qualified process engineer | A suitable rated capacity should be confirmed against the load profile and the machine’s permitted operating conditions. |
| 4. Check stroke, daylight, and bed space | Working envelope for the part, dies, and handling equipment | Required stroke, maximum open height, shut height, bolster dimensions, die height, and access for loading and removal | Adequate force does not guarantee that the tooling and workpiece will fit or can be handled safely. |
| 5. Set output and duty-cycle targets | Required parts per shift and operating schedule | Target good parts per hour, shifts per day, changeover frequency, expected cycle time, and planned maintenance downtime | Production targets help determine whether cycle speed, automation, and the planned duty cycle are appropriate. |
| 6. Specify control and process monitoring | Required control functions and production records | Pressure or force control, ram position settings, recipe storage, alarms, data logging, and interfaces required by the plant | Clearly defined controls support repeatable operation and make process monitoring easier. |
| 7. Confirm site and safety requirements | Installation conditions, utilities, and safeguarding | Available floor space, foundation and floor loading, electrical supply, hydraulic system needs, guarding, operator access, and applicable local regulations | Early site checks can prevent installation delays and help ensure safe integration into the production line. |