| Material identity and condition | Specify the material, grade, moisture condition, temperature, and whether its properties vary between batches. | Example: dry polymer pellets; note any recycled-content variation or temperature changes. | Test the actual production material. Changes in moisture, temperature, or formulation can affect flow and feeding behavior. |
| Bulk density | Provide loose and, where relevant, aerated or settled bulk density in kg/m³ or lb/ft³. | Example: a powder measured at 500 kg/m³; confirm the value using the material and test method used at the plant. | Density affects hopper capacity, screw fill, and the relationship between feeder speed and mass flow. |
| Particle size and shape | Record the particle-size distribution, largest particles, fines content, and particle shape. | Example: pellets around 3–5 mm with a small fines fraction; actual distribution should be measured. | Particle size helps determine screw geometry and clearance; irregular or broad-size materials may segregate or feed unevenly. |
| Flowability and cohesion | Describe whether the material is free-flowing, cohesive, prone to bridging, or sensitive to aeration. Use shear testing when flow behavior is uncertain. | Example: a fine powder that forms a stable arch after standing. | Cohesive materials may need a suitable agitator, mass-flow hopper design, or other flow aid. Confirm the solution through testing. |
| Required feed-rate range | State the minimum, normal, and maximum continuous rates, with units and expected operating duration. | Example: 10–100 kg/h continuous, with regular operation near the middle of the range. | Select a feeder whose usable range covers the operating points; verify performance at both low and high rates. |
| Accuracy and repeatability | Define the allowable deviation, averaging period, and test conditions. Distinguish short-term variation from long-term accuracy. | Example: a process target of ±1% over a specified test interval, subject to validation with the actual material and rate. | Accuracy depends on the feeder, load-cell system, control settings, installation, and material behavior. Request a documented performance test. |
| Batch size and hopper autonomy | Define how long the feeder should run between refills and the available space for the hopper and refill equipment. | Example: at 50 kg/h, a 25 kg usable inventory provides about 30 minutes of operation before accounting for refill and reserve requirements. | Size the usable inventory for the required autonomy. Allow for headspace, refill strategy, and stable weighing during operation. |
| Refill method and refill disturbance | Specify manual filling, vacuum conveying, or another refill method, including refill frequency and whether feeding must continue during refill. | Example: automatic refill every 20 minutes while maintaining a steady downstream feed. | Refill can introduce weight disturbances. Define how the system will manage refill and verify performance during the refill cycle. |
| Process interface and control | Document downstream equipment, control signals, operating modes, alarms, and required data communication. | Example: continuous setpoint from a plant controller, with feed-rate feedback and low-material alarm. | Confirm signal types and control responsibilities with the process team before specifying the feeder and controls. |
| Material and site conditions | Identify dust, abrasiveness, corrosiveness, temperature, washdown, hazardous-area classification, and applicable hygiene requirements. | Example: an abrasive powder in a dry indoor area, with dust containment required at transfer points. | These conditions affect contact materials, seals, enclosure, cleaning access, and required safety or compliance features. |
| Validation and acceptance criteria | Agree on the test material, target rates, run duration, refill conditions, sampling method, and acceptance limits before purchase. | Example: test at minimum, normal, and maximum rates using representative production material and record the measured deviation. | A defined acceptance test makes feeder performance comparable and helps confirm suitability for the real process. |