| Factory Identity | Confirm that the business is a manufacturer, a trading company, or a combination of both. Check that its registered business scope is relevant to electrical appliances or hair-care products. | Business license, factory address, product catalog, and a live video walkthrough showing production or assembly areas. | Shortlist only after the legal entity and operating location are clear. |
| Product Experience | Review experience with hair dryers comparable to the intended product in motor type, power range, features, and target market. | Current product specifications, anonymized project examples, sample units, and explanations of the factory’s role in design, assembly, and testing. | Prioritize relevant technical experience over a broad but unrelated product catalog. |
| Safety and Compliance | Identify the regulations and conformity requirements that apply in the destination market. Requirements depend on the product design and where it will be sold. | Applicable test reports and certificates for the exact model, with model numbers and issuing laboratory details that can be checked. | Do not treat a certificate for a different model as proof that the proposed product complies. |
| Electrical Design | Check rated voltage, frequency, wattage, plug type, overheating protection, insulation, and suitability for the intended market. | Product specification sheet, wiring or component information where available, and test documentation for the quoted configuration. | Confirm all electrical details in writing before approving a sample or quotation. |
| Quality Control | Ask how incoming components, in-process assembly, and finished products are inspected. Check how defects and corrective actions are recorded. | Quality-control procedure, sample inspection records, functional test checklist, and a description of product traceability. | Favor factories that can explain a repeatable process, not just a final visual inspection. |
| Motor and Component Sourcing | Clarify the motor type and the sourcing and approval process for key components such as heating elements, switches, cords, and thermal protectors. | Bill of materials or component list, approved-supplier process, and written notice requirements for component substitutions. | Require approval before any change to a safety-critical or agreed component. |
| Sample and Testing Process | Establish how samples are made, what features are included, and whether the sample matches the production specification. | Approved sample, dated specification, sample evaluation record, and a written process for handling revisions. | Approve a defined “golden sample” before mass production. |
| Production Capacity | Assess whether the factory can meet the order quantity and delivery schedule while maintaining its stated production and inspection processes. | Current production plan, stated lead time, capacity explanation, and confirmation of peak-season scheduling assumptions. | Compare capacity claims with the proposed order size and delivery dates; avoid relying on an unsupported maximum-capacity figure. |
| Minimum Order and Pricing | Compare minimum order quantity, unit price, tooling or customization costs, packaging costs, and payment terms on the same product specification. | Itemized quotation with currency, validity period, Incoterm, included packaging, sample charges, and any one-time fees. | Compare like-for-like quotations rather than choosing solely by the lowest unit price. |
| Packaging and Labeling | Check retail packaging, shipping protection, user instructions, language requirements, and any market-specific labeling needs. | Packaging artwork or dieline, carton specifications, label draft, and confirmation of who reviews and approves final artwork. | Approve final packaging and labels before production; confirm they match the destination-market requirements. |
| Communication and Contracts | Evaluate response clarity and confirm that specifications, quality criteria, delivery terms, and remedies are documented. | Written quotation, product specification, purchase agreement, inspection criteria, and named contacts for production and quality issues. | Prefer written, specific commitments over informal assurances in messages or calls. |
| Independent Verification | Verify key claims before placing a large order. Consider an independent factory audit, pre-shipment inspection, or laboratory testing as appropriate. | Audit or inspection report, shipment inspection results, and test results tied to the final production model or batch. | Use independent checks when order value, compliance risk, or product complexity justifies them. |