| Building Type and Scope | Confirm whether the supplier provides the specific system required, such as modular, panelized, or other prefabricated construction, and clarify what is included in its scope. | Building system; included components; exclusions; design, manufacturing, delivery, and installation responsibilities. | Suppliers may use different definitions of a “complete building,” so scope must be compared consistently. |
| Code and Permit Support | Ask which applicable building-code requirements the proposed design addresses and what drawings or documents are provided for local permit review. | Applicable jurisdiction; design documents available; approvals or reviews required; items assigned to the owner or local design team. | Building requirements depend on location, occupancy, site conditions, and the authority having jurisdiction. |
| Structural Design | Request project-specific structural information and identify the loads and site conditions used in the design. | Design criteria; structural drawings and calculations; foundation interface; responsibility for site-specific engineering. | Wind, snow, seismic, soil, and other design conditions vary by site and should be addressed for the actual project. |
| Materials and Specifications | Review written specifications for the structure, insulation, windows, doors, finishes, and any included mechanical or electrical provisions. | Material descriptions; performance specifications; stated substitutions; documentation available for specified products. | Clear specifications make it easier to compare quality and identify differences between proposals. |
| Manufacturing Quality | Ask how production is inspected, how defects are documented, and how nonconforming work is corrected. | Inspection stages; quality records provided; corrective-action process; third-party inspection, if applicable. | A documented quality process helps establish how manufacturing issues are identified and resolved. |
| Experience and References | Request references for completed projects with comparable building type, size, scope, and site conditions. | Project type and location; approximate size; scope delivered; reference contact; lessons from completed work. | Relevant project experience is more informative than an unverified general claim about experience. |
| Pricing and Exclusions | Obtain an itemized quotation and check for items that may be priced separately or excluded. | Quoted scope; taxes and fees; delivery and installation; site work; foundations; utility connections; change-order terms. | A low initial price may not represent the total project cost if major work is excluded. |
| Schedule and Delivery | Ask for the assumptions behind the proposed production and delivery schedule, including dependencies and delay procedures. | Design approval milestones; estimated manufacturing duration; delivery method; site-access requirements; schedule remedies or terms. | Manufacturing, transport, permitting, weather, and site readiness can affect the overall project timeline. |
| Transport and Installation | Clarify who arranges transport, unloading, lifting equipment, assembly, and on-site supervision. | Delivery boundary; unloading responsibility; crane or lifting requirements; installation crew; weather and access assumptions. | Transport limits and site access can influence cost, logistics, and the installation plan. |
| Warranty and Service | Review the written warranty, exclusions, claim process, and availability of post-delivery support. | Covered components; warranty duration by component; maintenance requirements; response and repair process. | Warranty terms differ, and written conditions determine what is covered. |
| Contract and Payment Terms | Have the proposed contract reviewed for deliverables, payment milestones, acceptance criteria, change control, and cancellation terms. | Payment schedule; deposit terms; milestone definitions; change-order process; dispute and termination provisions. | Clear contract terms help define responsibilities and reduce misunderstandings during the project. |
| Supplier Comparison Method | Use the same project brief and evaluation criteria when requesting proposals from each supplier. | Record each item as confirmed, unclear, excluded, or not applicable; request written clarification for gaps. | Consistent inputs make proposals easier to compare without relying on assumptions or headline prices alone. |