| Customization Capability |
20% |
Ability to adapt the optical system, stage size, lighting, fixtures, software functions, and output format to the application. |
Written specifications for each customized item, engineering drawings, interface requirements, and an agreed acceptance procedure before production. |
Approved technical proposal, sample images, engineering change records, and a pre-production sample or demonstration. |
0–5 |
| Measurement Accuracy |
15% |
Accuracy and repeatability of dimensional measurements under defined temperature, magnification, lighting, and operator conditions. |
The supplier states accuracy and repeatability separately, including the measurement range and test conditions. Do not accept a single unsupported “high accuracy” claim. |
Inspection report, test method, uncertainty information, reference artifacts, and measurement data from multiple repeated readings. |
0–5 |
| Optical Configuration |
8% |
Objective magnification, zoom range, working distance, depth of field, image resolution, and suitability for the target material. |
The optical specification matches the smallest feature to be inspected and provides sufficient working distance for the intended fixture or part. |
Optical data sheet, field-of-view information, sample images at relevant magnifications, and a practical demonstration. |
0–5 |
| Stage and Fixture Design |
7% |
Stage travel, load capacity, flatness, positioning method, fixture compatibility, and access for irregular or delicate parts. |
Travel and load capacity exceed the largest intended workpiece requirements, with a documented mounting pattern and repeatable part positioning. |
Mechanical drawings, load specifications, stage test results, fixture drawings, and compatibility confirmation. |
0–5 |
| Calibration and Traceability |
10% |
Calibration method, reference standards, calibration interval, environmental conditions, and traceability of measurement results. |
Calibration records identify the instrument, standards used, measurement results, date, conditions, and responsible technician. Calibration should be traceable to recognized national or international standards. |
Calibration certificate, reference-standard certificates, calibration procedure, and information about the issuing laboratory. ISO/IEC 17025 accreditation is valuable for calibration laboratories. |
0–5 |
| Quality Management |
8% |
Control of incoming components, assembly inspection, final testing, nonconformity handling, and product traceability. |
A current ISO 9001 certificate from an accredited certification body, supported by documented final inspection and serial-number traceability. |
Certificate scope and validity, quality-control plan, final inspection report, serial-number records, and corrective-action process. |
0–5 |
| Market Compliance |
7% |
Compliance documents required for the destination market, including electrical safety, electromagnetic compatibility, and restricted substances where applicable. |
For the European Economic Area, applicable CE conformity documentation should cover the complete delivered configuration. RoHS documentation is relevant when the equipment falls within its scope. |
EU Declaration of Conformity, applicable test reports, technical documentation, user manual, and product labeling. A certificate alone is not a substitute for a valid conformity assessment. |
0–5 |
| Software and Data Output |
5% |
Measurement tools, image storage, report generation, user permissions, data export, and compatibility with existing inspection workflows. |
The software supports the required measurement functions and exports commonly usable formats such as CSV, PDF, or image files, subject to version and license conditions. |
Software demonstration, function list, sample report, license terms, update policy, and data-security information. |
0–5 |
| Technical Support |
10% |
Installation, operator training, remote diagnosis, response time, spare parts, preventive maintenance, and escalation procedures. |
A documented support process with named contacts, remote troubleshooting, training materials, spare-parts availability, and defined response targets. |
Service-level agreement, training agenda, troubleshooting guide, spare-parts list, support records, and escalation contacts. |
0–5 |
| Warranty and Lifecycle Cost |
10% |
Warranty coverage, exclusions, consumables, calibration costs, software fees, replacement parts, packaging, shipping, and installation expenses. |
The quotation clearly separates equipment price, customization, freight, taxes, installation, training, calibration, software licenses, and recurring costs. |
Detailed quotation, warranty terms, spare-parts price list, service rates, expected maintenance schedule, and total-cost-of-ownership estimate. |
0–5 |