| Regulatory Compliance | 18% | Confirm the product’s intended use, classification, and regulatory pathway for each destination market. Requirements differ by jurisdiction and product configuration. | Model-specific declarations and technical documentation; applicable conformity certificates and test reports; current certificate scope and validity. For the United States, distinguish FDA establishment registration or device listing from FDA clearance or approval—registration or listing alone does not mean FDA endorsement. |
| Product Performance | 18% | Assess the pump and mattress system against your written specification: operating modes, cycle settings, pressure adjustment, alarms, user controls, and compatibility with the intended bed and patient population. | Product specification, user manual, model-specific functional test records, and sample evaluation results. Check that stated performance is supported by test methods and defined conditions; do not treat one specification as suitable for every patient or care setting. |
| Quality Management | 16% | Evaluate whether documented processes cover design changes, incoming materials, production inspection, nonconformities, corrective actions, and complaint handling. | Quality-management-system certificate where applicable, verified with the issuer and checked for scope and expiry; audit summary; inspection procedures; sample corrective-action and complaint-handling records with confidential details removed. |
| Electrical and Product Safety | 12% | Review electrical safety, electromagnetic compatibility, alarms, labeling, and foreseeable-use risks for the complete pump and mattress configuration. | Relevant, current test reports for the offered model and configuration. IEC 60601-series requirements may be relevant to medical electrical equipment; confirm the applicable standards and editions with the destination-market regulatory specialist or testing laboratory. |
| Manufacturing Capability | 10% | Check whether the supplier can consistently build the quoted design and manage production capacity, process controls, component sourcing, and change notifications. | Facility details, production flow, capacity assumptions, process-control records, supplier-control procedures, and a written policy for notifying buyers of material or design changes. Verify whether the contracting party is the manufacturer or a trading company. |
| Traceability and Documentation | 8% | Confirm that each unit can be linked to production and inspection records, and that product labeling and documentation match the ordered model. | Example serial-number or lot-traceability record; sample label, packing list, inspection report, and user manual; documented retention period and procedure for handling field safety issues or recalls. |
| Samples and Verification | 8% | Test a production-representative sample before approving a bulk order. Check fit, operation, alarms, cleaning instructions, packaging, and consistency with the agreed specification. | Approved sample and signed specification; pre-shipment inspection plan with acceptance criteria agreed in advance; documented resolution process for defects or failed tests. Confirm whether the sample is made using normal production processes. |
| Commercial Transparency | 5% | Compare the full cost and terms, not only the unit price. Review tooling, spare parts, packaging, payment terms, lead time, Incoterms, and order-change conditions. | Itemized quotation, written lead-time assumptions, warranty terms, spare-parts pricing, packaging details, and clearly identified contracting and payment entities. Confirm who is responsible for export documents and agreed inspection costs. |
| After-Sales Support | 5% | Assess access to technical support, replacement parts, training materials, warranty service, and a process for handling customer complaints. | Written response and escalation process, parts availability policy, warranty procedure, troubleshooting guide, and training documentation in the languages needed for your market. |