| Usable web width | mm | Maximum processable substrate width and usable coating width. Coating width may be narrower than the web because of edge margins and trimming. | Machine drawing showing web path, coating width, edge margins, and any trim allowance. |
| Line speed | m/min | Compare stable production speed under the specified material, coating, and drying conditions—not only the machine’s maximum mechanical speed. | Guaranteed speed range and a test report identifying the substrate, coating formulation, wet laydown, and drying settings used. |
| Coating method | Method and configuration | Confirm the applicator type, such as slot-die, knife, or comma-bar coating, is suitable for the formulation, substrate, and required coating profile. | Applicator specification, compatible viscosity range, adjustment range, and sample coating results. |
| Coating thickness or coat weight | µm, g/m², or both | Establish whether the quoted value refers to wet or dry thickness. For coat weight, clarify the measurement method and the target uniformity across the web. | Specified operating range, cross-web uniformity data, measurement method, and samples from a representative production trial. |
| Drying oven configuration | Number of zones; oven length in m | Compare usable heated length, zone arrangement, airflow design, and temperature-control range. Suitability depends on the material and coating process. | Oven layout, zone-by-zone temperature settings, airflow details, and a documented drying trial at the proposed line speed. |
| Drying performance | Residual solvent or moisture; test method | Set an agreed product-specific endpoint. Oven temperature alone does not establish that a coating is adequately dried. | Test method, measured results, operating conditions, and any applicable product acceptance limits. |
| Web tension control | N or N/m; control zones | Check whether tension is controlled through unwinding, coating, drying, and rewinding, and whether the range suits the substrate’s strength and stretch. | Tension range, sensor and control description, zone layout, and trial data using the intended substrate. |
| Unwind and rewind capacity | Roll diameter in mm; core size in mm | Confirm the maximum roll diameter, supported core sizes, roll weight, and winding mode fit the production format. | Mechanical drawings and rated limits for both unwind and rewind stations. |
| Web guiding and alignment | Configuration and correction range | Review edge- or line-guiding equipment, sensor placement, and its compatibility with the intended substrate and web path. | Guiding-system specification, layout, and demonstration with the specified substrate. |
| Automation and recipe control | Functions and control-system details | Compare recipe storage, coordinated speed and tension control, alarm history, operator access levels, and production data recording. | Control-system description, sample recipe, alarm list, and demonstration of the functions included in the quotation. |
| Solvent handling and exhaust | Airflow in m³/h; solvent and safety details | For solvent-based processes, review exhaust design, solvent handling, monitoring needs, and compliance obligations for the installation location. | Process-specific ventilation design, risk documentation, and confirmation of applicable local code requirements by qualified parties. |
| Inspection and quality monitoring | Available inspection functions | Check options for detecting coating defects, monitoring web breaks, and recording quality data. Confirm which functions are standard and which are optional. | Equipment list, defect-detection capabilities, sample reports, and a clear scope of supply. |
| Utilities and operating requirements | kW, voltage, compressed air, exhaust, and other stated units | Compare connected electrical load and required plant services against the factory’s available capacity. | Utility schedule for the quoted configuration, including operating conditions and any exclusions. |
| Acceptance testing and support | Test protocol; service terms | Define measurable acceptance criteria for speed, coating quality, drying endpoint, and continuous operation before purchase. | Factory and site acceptance-test plans, commissioning scope, training details, spare-parts list, and warranty terms. |