| Application and service environment | Confirm whether the pipe is for potable water, wastewater, industrial service, or a buried or submerged pipeline. Clarify the conveyed fluid, external environment, and applicable jurisdictional requirements. | Written product specification identifying the intended service and the applicable project standards. | The supplier can show that the proposed coating system is designed and qualified for the project’s specific service—not merely described as “FBE coated.” |
| Applicable coating standard | Identify the exact standard and edition required by the owner or project specification. AWWA C213 covers fusion-bonded epoxy coatings for the interior and exterior of steel water pipelines and fittings. ISO 21809-2 addresses external FBE coatings for pipelines in the petroleum and natural gas industries. | Clause-by-clause compliance statement, coating procedure, and supporting qualification or test records. | The supplier confirms the standard’s scope is appropriate and agrees to the required edition and project-specific additions. |
| Pipe material, diameter, and length | Check the available steel grades, outside diameters, wall thicknesses, pipe lengths, and end configurations against the approved drawings and purchase specification. | Manufacturing range, sample inspection plan, and confirmation of the required tolerances and end preparation. | The supplier confirms every requested size and configuration in writing and explains any limits or production constraints. |
| Coating thickness and coverage | Specify the required dry-film thickness, internal and external coating coverage, uncoated areas, and treatment of pipe ends. Do not assume one thickness suits every service or standard. | Project-specific coating data sheet, inspection method, and agreed acceptance criteria. | The proposed thickness and coverage match the project specification and are measurable and inspectable during production. |
| Surface preparation and application process | Ask how the steel is cleaned, prepared, heated, coated, and cooled. If the project requires abrasive blast cleaning to ISO 8501-1 Sa 2½, confirm how the supplier verifies and records it; confirm the required surface profile separately. | Process procedure, surface-preparation records, and process-control records for coating application. | The supplier provides documented controls for surface cleanliness, profile, application conditions, and handling between preparation and coating. |
| Inspection and testing | Agree on inspection stages and acceptance criteria for thickness, appearance, adhesion, and discontinuities (holiday testing), where required. Test methods and holiday-test settings should follow the governing specification and coating thickness. | Inspection and test plan, instrument calibration records, test reports, and nonconformance procedure. | Records identify the inspected pipe or batch, test method, acceptance limits, results, and disposition of any nonconforming product. |
| Field joints and repairs | Confirm the specified field-joint coating system, repair materials, surface preparation, and repair acceptance procedure. Factory-applied FBE does not by itself define how field joints should be coated. | Compatible field-joint and repair procedures, product data, and repair inspection requirements. | The factory coating, field-joint system, and repair method are compatible and covered by the project specification. |
| Quality assurance and traceability | Ask how raw materials, production batches, inspection results, and pipe identification are linked. Confirm required quality-system certifications and their scope and validity. | Quality-system certificate, sample inspection records, traceability format, and document register. | Each shipment can be traced to the relevant production and inspection records, with documentation supplied in the required format. |
| Delivery and export readiness | Confirm production lead time, inspection access, packaging, loading method, shipping documents, and delivery terms. Agree on protection against coating damage during handling and transport. | Production schedule, packaging plan, shipment document list, and agreed inspection or release milestones. | The delivery plan fits the project schedule and includes practical protection, inspection access, and clear responsibility for logistics. |
| Commercial and project support | Compare quotations on the same basis: coating scope, pipe specification, inspection, packing, delivery terms, exclusions, and warranty conditions. | Itemized quotation, list of deviations and exclusions, warranty terms, and named technical contact role. | The offer is technically complete and transparent, with deviations resolved before award rather than left as assumptions. |