| 1 | Automotive quality management | Consistent production controls, traceability, corrective action, and change management are important for automotive electrical components. | Current IATF 16949 certificate and scope; manufacturing-site details; process-control and traceability examples relevant to the proposed product. | Verify certificate validity, site, and scope. Record any gaps for the intended production location. |
| 2 | Environmental and electrical validation | Underhood components can face temperature variation, vibration, humidity, and other vehicle operating conditions. | Design-validation plan and test reports mapped to applicable customer requirements and relevant ISO 16750 test methods. | Confirm that tests match the vehicle location, operating conditions, and agreed product specification. |
| 3 | Ingress protection and sealing | Exposure to water, dust, and cleaning processes depends on the installation location and enclosure design. | Specified IP rating, test configuration, sealing design details, and reports using applicable ISO 20653 methods. | Check that the rating applies to the complete assembly and its specified connectors, covers, and seals. |
| 4 | Fuse and circuit-protection compatibility | Fuse type, current rating, derating, terminal design, and circuit loading must suit the vehicle electrical architecture. | Supported fuse formats and ratings; terminal temperature-rise data; current-derating guidance; coordination evidence against the vehicle requirements and applicable ISO 8820 series parts. | Require application-specific confirmation; do not select a fuse solely by its nominal current rating. |
| 5 | Connector and terminal performance | Electrical connection reliability depends on terminal design, retention, contact resistance, and the intended mating interface. | Connector specifications, terminal and plating details, retention and electrical test results, and applicable customer or industry test reports, such as USCAR-2 where required. | Verify that the tested connector configuration matches the proposed production design. |
| 6 | Design engineering and customization | Packaging, mounting, circuit layout, service access, and interfaces must fit the vehicle program. | CAD data, interface-control documentation, design-change process, prototype support, and documented experience with comparable underhood applications. | Assess response to the actual package, electrical, thermal, and serviceability requirements. |
| 7 | Production readiness and supply continuity | Stable delivery requires controlled ramp-up, capacity planning, material management, and contingency planning. | Proposed production location, capacity and lead-time assumptions, launch plan, component-sourcing approach, and business-continuity or recovery plan. | Compare documented plans with the program’s volume, launch timing, and regional supply needs. |