| 1 | Application and process fit | Confirm that the proposed machine supports the required process, glass types, thickness range, maximum workpiece size, edge or hole specifications, and production layout. | Written technical proposal; machine configuration and process-flow description; confirmation against the buyer’s actual product drawings and material specifications. | 20% |
| 2 | Output and cycle time | Compare achievable throughput for the buyer’s product mix, including loading, processing, changeover, unloading, and any required inspection steps. | Cycle-time breakdown with stated assumptions; sample-production results; witnessed acceptance test using representative workpieces. | 15% |
| 3 | Finished-product quality and precision | Assess whether finished parts meet agreed requirements for dimensions, edge finish, hole position, flatness, or other relevant characteristics. Requirements depend on the process and product. | Buyer-approved inspection plan; measurement records from sample parts; clearly defined acceptance tolerances and test conditions. | 15% |
| 4 | Reliability and after-sales service | Compare service response arrangements, remote troubleshooting, spare-parts availability, maintenance guidance, warranty scope, and support hours across time zones. | Written service-level terms; warranty exclusions and duration; recommended spare-parts list; service contacts and support escalation process. | 15% |
| 5 | Safety and regulatory documentation | Check guarding, emergency-stop provisions, electrical documentation, operating instructions, and conformity requirements applicable in the installation country. | Risk and safety documentation; electrical drawings; user manual; relevant declarations or certificates, with scope and validity checked against the target market. | 10% |
| 6 | Installation and commissioning | Establish site requirements, utilities, foundation or floor needs, delivery access, installation responsibilities, commissioning duration, and operator training arrangements. | Site-preparation checklist; installation schedule; written division of responsibilities; training plan and commissioning acceptance criteria. | 8% |
| 7 | Total cost of ownership | Compare the full purchase and operating costs, not only the quoted machine price. Include tooling, freight, duties, installation, consumables, energy, maintenance, and spare parts where applicable. | Itemized quotation; payment and delivery terms; stated exclusions; estimated operating-cost assumptions; spare-parts pricing and availability terms. | 10% |
| 8 | Supplier capability and project transparency | Assess whether the supplier can document its manufacturing, quality-control, engineering-change, and project-management processes for the specific machine being offered. | Factory or remote audit; quality-system documentation with certificate scope checked where relevant; project schedule; inspection and change-control records. | 7% |