| Product configuration | Confirm whether “double glass” means a double-glazed insulated glass unit, two separate door leaves, or another configuration. Review glass type, cavity, frame material, hardware, dimensions, and opening style. | Itemized quotation, drawings, glass build-up, hardware schedule, and written product specifications. | Make sure every quotation uses the same configuration; the term “double glass door” alone does not define a complete specification. |
| Insulating glass performance | Review the stated thermal and condensation performance of the insulating glass unit (IGU), including spacer, edge seal, gas fill if specified, and glass thickness. | Test reports or technical documentation for the proposed IGU and the relevant production configuration. | Check that reports identify a comparable glass build-up and that declared performance values apply to the offered product, not a different sample. |
| Safety glazing | Determine whether tempered, laminated, or other safety glazing is required for the door’s location, dimensions, and destination market. | Glass markings, product declarations, and test documentation against the applicable destination-market requirements. | Verify requirements for impact-prone areas and confirm that the glass type and thickness are stated on the drawings and order documents. |
| Applicable standards | Check whether the offered glass and door system meet the standards required for the project and destination market. | Relevant, current test reports and declarations. Examples for reference include EN 1279 for insulating glass units, EN 12150 for thermally toughened soda-lime silicate safety glass, and ASTM E2190 for insulating glass unit performance, where applicable. | Confirm the standard’s scope, edition, test laboratory, sample description, and market applicability. A standard reference alone is not proof of compliance. |
| Quality management and traceability | Assess documented inspection procedures, control of incoming materials, production checks, and traceability of glass and hardware batches. | Quality-process overview, sample inspection records, batch identification method, and any relevant quality-management certificate, such as ISO 9001. | Check certificate scope, validity, and issuing body; ask how a delivered door can be traced to its production and material records. |
| Fabrication capability | Evaluate the manufacturer’s ability to produce the required sizes, tolerances, opening types, finishes, and project-specific details. | Dimensioned shop drawings, documented tolerances, production photos, and examples of comparable configurations. | Have the manufacturer confirm maximum dimensions, weight limits, and any design constraints in writing before placing an order. |
| Weather sealing and durability | Review the design of seals, drainage, thresholds, corner joints, and hardware, especially where exposure to rain or wind is expected. | System details, relevant air or water performance test reports, and maintenance guidance. | Check that test results represent the complete door system and comparable dimensions, configuration, and installation conditions. |
| Thermal and acoustic claims | Compare declared whole-door thermal transmittance and sound-reduction performance when these are project requirements. | Test or calculation reports identifying the tested door or glazing assembly, dimensions, and configuration. | Do not compare glass-only values with whole-door values; confirm the rating method and configuration are consistent. |
| Packaging and shipping | Assess protection for glass, frames, and hardware during handling and international transport, along with packing-list accuracy. | Packaging specifications, crate or pallet photos, loading plan, and written procedure for reporting transit damage. | Agree on packaging, shipment inspection, and damage-notification steps before dispatch; clarify who arranges transport insurance. |
| Lead time and order control | Compare the quoted production schedule, approval milestones, material lead times, and shipping arrangements for the specific order. | Order-specific timeline, drawing-approval process, and written update procedure for delays or specification changes. | Use the same scope and delivery terms when comparing quotations; distinguish production time from transit time. |
| Warranty and after-sales support | Review warranty duration and coverage for glass, seals, frames, finishes, and hardware, plus exclusions and claim procedures. | Written warranty terms, spare-parts policy, installation guidance, and response process for defects. | Confirm when the warranty starts, what evidence is required for a claim, and whether replacement parts can be supplied to the destination market. |
| Quotation transparency | Check that material specifications, quantities, accessories, finish, packaging, shipping terms, and exclusions are itemized. | Detailed quotation, commercial invoice format, and clearly stated delivery terms. | Compare total landed cost where possible, including freight, insurance, duties, installation, and any items excluded from the quotation. |