| Product and format coverage | 15% | Product samples, approved drawings, material specifications, and a list of supported sizes and product formats. | Confirm that the proposed line can make the buyer’s specified products, such as baby diapers, pants, or adult incontinence products. Check change parts and adjustment requirements for each format. | Require written confirmation for every product and size included in the purchase scope. |
| Production speed and output | 15% | A product-specific performance commitment, test conditions, output records, and the agreed definition of good product. | Compare measured output with the contract target using the same product design, materials, operating period, and quality criteria. Rated speed alone does not establish saleable output. | Set the target and measurement method in the contract; do not use a generic market speed as a universal benchmark. |
| Product quality and process control | 15% | Quality-control plan, inspection points, sample products, defect definitions, and records from a witnessed production run. | Inspect dimensions, component placement, seals, absorbent-core consistency, and other buyer-defined product requirements. Agree on sampling and pass/fail rules before testing. | Approve samples against the buyer’s product specification and documented quality limits. |
| Material waste and changeovers | 10% | Material-consumption calculation, startup and changeover procedures, waste records, and a list of required change parts. | Measure material use and scrap during an agreed production test. Assess the time, labor, and material needed to change sizes or product formats. | Define waste limits and changeover conditions by product and test protocol; there is no single universal limit for all lines. |
| Automation, controls, and data | 10% | Controls architecture, operator-interface demonstration, alarm list, data-export options, and documentation for supported interfaces. | Check whether operators can access production status, alarms, and relevant process settings. Confirm compatibility with the buyer’s plant systems and cybersecurity requirements. | Document required data points, access levels, interface responsibilities, and any integration work before purchase. |
| Safety and destination-market compliance | 10% | Risk assessment, safeguarding details, electrical documentation, operating instructions, and conformity documents applicable to the destination. | Review guarding, emergency stops, access points, maintenance procedures, and applicable legal requirements for the installation country. | Have qualified personnel verify applicable requirements; a certificate or label should not be assumed to cover every destination or configuration. |
| Installation, commissioning, and training | 8% | Installation scope, site-preparation checklist, commissioning plan, training agenda, and responsibility matrix. | Confirm what the supplier and buyer each provide, including utilities, foundations, labor, materials, travel, and production support. | Agree on site-readiness requirements, training completion, commissioning tests, and handover documents. |
| Service, spare parts, and maintainability | 8% | Recommended spare-parts list, maintenance schedule, service escalation process, and stated support coverage. | Check whether routine maintenance tasks are accessible and documented. Verify parts identification, ordering process, and the service response terms offered in writing. | Specify critical spares, support channels, service hours, and response commitments in the purchase agreement. |
| Delivery, project execution, and references | 5% | Project schedule, milestone plan, scope boundaries, and references for comparable equipment where available. | Assess schedule assumptions and the supplier’s process for design reviews, approvals, testing, shipment, installation, and issue resolution. | Use a milestone-based schedule with named deliverables, review points, and documented change control. |
| Total cost of ownership | 4% | Itemized quotation, exclusions, utility requirements, consumables assumptions, maintenance costs, and warranty terms. | Compare the complete installed scope and expected operating costs, not only the equipment purchase price. Use the same production and cost assumptions for each proposal. | Record assumptions and exclusions; evaluate comparable lifecycle costs over the buyer’s chosen planning period. |